News

2017 Hurricane Harvey - Electrical Infrastructure Storm Restoration
07 September 2017

2017 Hurricane Harvey - Electrical Infrastructure Storm Restoration

Electrical Infrastructure Storm Restoration


Our hearts go out to those working to recover from Hurricane Harvey. We hope your families remain safe, and that you are able to get back on your feet as swiftly as possible.

We recognize the enormous impact a storm of this magnitude can have on infrastructure of many kinds, including electrical. When the time comes, the electrical experts at Magna IV Engineering have pledged to have boots on the ground, with teams ready to assist with storm restoration of electrical infrastructure, including power distribution, automation, controls and lighting.

We can offer cleanup, performance testing, site walkthroughs for equipment assessment, maintenance and recommissioning, start-up support, troubleshooting and engineering studies for all kinds of facilities along the gulf coast.

Contact us at our Houston office.

Aric Proskurniak
info.houston@magnaiv.com
800.462.3157

4407 Halik Road, E300
Pearland, Texas 77581


At a high level, our full spectrum electrical services include engineering studies, design, replacement & retrofit, project management, planning, construction support, testing, commissioning & startup, training, maintenance, refurbishment, troubleshooting and root cause analysis.

Related

Post a Comment

Magna IV Engineering
Magna IV Engineering