Extending Equipment Life in Data Centers
Data centers are replacing electrical equipment that they don't actually need to replace. When an inspection report flags aging switchgear, an original equipment manufacturer (OEM) end-of-life notice lands in your inbox, or a near-miss event forces a budget conversation, the pressure points toward replacement. That pressure is understandable. Each of those trigger events feels urgent, and urgency tends to default to the most visible option. However, age doesn't equal failure

Magna
Oct 266 min read
Â
Â
Â


Automation and Controls for Mission-Critical Facilities: SCADA, DCS, PLC Integration
Most data centres running critical operations already have the right platforms in place. There's a SCADA system collecting facility-wide data, a DCS managing cooling processes, and PLCs controlling generators, transfer switches, and power distribution equipment. The automation and controls foundation is there. The gap is integration. Effective SCADA, DCS, and PLC integration in a mission-critical facility means those three layers share data, trigger automated responses, and g

Magna
Oct 265 min read
Â
Â
Â


Complete Guide to Data Center Electrical and Automation Commissioning
A single overlooked wiring error during site acceptance testing can mean weeks of delays and six-figure rework costs after a data center goes live. For engineers and project managers overseeing mission-critical builds, the challenges compound quickly. Tight budgets, regulatory compliance requirements, aging infrastructure, and the constant pressure to deliver a facility that performs reliably from day one all create real exposure. This complete guide to data center electrical

Magna
Oct 266 min read