Project References

Propane Export Terminal - Engineering, Commissioning and Automation Support

Propane Export Terminal - Engineering, Commissioning and Automation Support

Magna IV Engineering was initially contracted to conduct an engineering study on the high and medium voltage utility connection. This was shortly followed by a request to test and validate a 13.8kV cable prior to installation. The growing relationship with the client then led to Magna IV offering a full spectrum of commissioning and start-up support services. This included testing and commissioning of switchgear equipment, oil filled distribution transformers, high and medium voltage cables and ...
Read More
15kV Transformer Bushing Swap

15kV Transformer Bushing Swap

Magna IV Engineering’s Denver team recently did an extensive job for the facility involving a 15-kV bushing swap. The process called for draining the oil level of about 300 gallons to reach the bushing level, swapping the bushing by climbing right into the tank, and refilling the transformer.
Read More
Colstrip Powerplant 500kV GSU Transformer Commissioning

Colstrip Powerplant 500kV GSU Transformer Commissioning

The Colstrip power plant, east of Billings, Montana first came online in 1976, and operates four coal-fired generating units capable of producing up to 2,094MW of electricity. The upgrade of an existing transformer bank was required to continue the safe and reliable operation.
Read More
Page 1 of 13 FirstPrevious [1]

Ready to take the next step?

Magna IV Engineering
Magna IV Engineering