Having completed a feasibility study, Magna IV Engineering was engaged to complete upgrades to the primary power generator control system. The desired outcome was to solve start up, synchronization and load sharing challenges experienced at site.
Magna IV Engineering was responsible to upgrade the existing Woodward and PLC-based generator control system with a simplified solution from ComAp.
Near Edson, Alberta
2018