Magna IV Engineering was engaged as a sub-consultant to provide power distribution, lighting, controls, instrumentation, and SCADA design services for the new Roxborough Water Treatment Plant, south west of Denver, Colorado. This 8 million gallon per day plant contains 8 filter sections and 2 clear wells along with chemical skids, 3 clarifiers, and UV disinfection process within the three-building facility. The system encorporates Cutler-Hammer/Eaton Switchgear and Motor Control Centers, and is controlled by an Allen-Bradley ControlLogix PLC from a manned control room. The plant has a 2500A 480V 3-phase electrical service with 100% emergency backup power. There are 5 125HP distribution pumps along with multiple motor loads in the 3-100HP range. Magna IV Engineering's scope also includes meter vault and network design, as well as area classification for rooms with hazardous location requirements.

Location

Roxbourough State Park, Colorado

Year Completed

2017 (Estimated)

Value

$429k

Tags

Water Treatment Plant, Control System, SCADA, Power System

Categories

Infrastructure, Power, Control

Ready to take the next step?

Magna IV Engineering
Magna IV Engineering