Project References

Archive by category: PowerReturn
Medium and High Voltage Power System Maintenance, Paradise Hill, Saskatchewan

Medium and High Voltage Power System Maintenance, Paradise Hill, Saskatchewan

Maintenance testing of the following equipment: 25kV power transformers, cables; 480V MCC’s, breakers, instrument transformers, motors and protective devices; IR Scanning of all electrical equipment prior to scheduled maintenance shutdowns
Read More
69kV Substation Maintenance and Testing, Prince Rupert, BC

69kV Substation Maintenance and Testing, Prince Rupert, BC

Magna IV Engineering was hired to perform high voltage electrical maintenance at Price Rupert Port Authority's Fairview Terminal substations.
Read More
15kV and 5kV EPR Cable Terminations and Acceptance Testing

15kV and 5kV EPR Cable Terminations and Acceptance Testing

15kV and 5kV EPR cable terminations associated with the NOVA R3 project.
Read More