144kV Substation Commissioning

144kV Substation Commissioning

Magna IV Engineering completed apparatus testing for 144kV/25kV equipment in the Wood Buffalo Region.
Read More
Waste Material Loadout System, Electrical and Control Engineering

Waste Material Loadout System, Electrical and Control Engineering

Magna IV Engineering provided electrical and controls engineering services for the Penasquito Mine waste material loadout system.
Read More
240kV Switching Station Commissioning

240kV Switching Station Commissioning

OverviewThe 356S, 240 kV Switching Station at Milo was built as part of the Southern Alberta Transmission reinforcement Project. The double busbar, breaker-and-a-half configuration system is the largest of its kind in Alberta. This overall 240 kV system provides flexible switching capability between three critical substations (Langdon 102S, North Lethbridge 370S, and West Brooks 78S) and thereby increases EHV system reliability in the region. Our scope of work consisted of apparatus testing...
Read More