Project References

Archive by tag: SubstationReturn
69kV Substation Maintenance and Testing, Prince Rupert, BC

69kV Substation Maintenance and Testing, Prince Rupert, BC

Magna IV Engineering was hired to perform high voltage electrical maintenance at Price Rupert Port Authority's Fairview Terminal substations.
Read More
Substation Maintenance, Halkirk Wind Farm

Substation Maintenance, Halkirk Wind Farm

Magna IV Engineering performed maintenance testing and inspections on the medium and high voltage equipment at the windfarm's 230kV/34.5kV substation. This testing and inspection included all of the primary 230kV and 34.5kV equipment along with the protection relaying for the collector circuits and main power transformer.
Read More
115kV Substation Feasibility Study

115kV Substation Feasibility Study

Magna IV Engineering performed a feasibility study to investigate three options and provide a recommendation to extend the useful life and increase capacity of the North Fountain Substation, in Fountain, Colorado.
Read More
Page 1 of 2 FirstPrevious [1]2 Last

Ready to take the next step?

Magna IV Engineering
Magna IV Engineering