Project References

Archive by tag: VFDReturn
Waste Material Loadout System, Electrical and Control Engineering

Waste Material Loadout System, Electrical and Control Engineering

Magna IV Engineering provided electrical and controls engineering services for the Penasquito Mine waste material loadout system.
Read More
Design, Testing & Commissioning, Radomiro Tomić Mine

Design, Testing & Commissioning, Radomiro Tomić Mine

Radomiro Tomić Mine, crushing and conveyor system electrical and controls engineering as well as onsite commissioning and startup.
Read More

Ready to take the next step?

Magna IV Engineering
Magna IV Engineering