Power

Power Systems

We are experts in power systems, having worked with high, medium and low voltage power since 1982.

Voltage Classification Range
Low 120V to 600V
Medium 2.4kV to 35kV
High 69kV to 500kV

Our Scope

Our Electrical Engineering and Technical Field Service scope in the world of Power Systems,

  • Electrical System Planning and Design
  • Factory Acceptance Testing
  • Electrical Equipment Commissioning
  • Cable Termination and Testing
  • Power System Start Up
  • Power System Maintenance
  • Infrared Inspection
  • Electrical Equipment Evaluation
  • Power System Troubleshooting and Diagnostics
  • Power Quality Monitoring
  • Electrical Reliability Analysis and Reporting
  • Power System Upgrades
  • Electrical Equipment Installation
  • Power System Studies
  • Arc Flash Studies
  • Arc Flash Training
  • Electrical Subject Matter Training
NETA Accredited

As a long standing member of NETA, we are committed to advancing industry standards for power system installation and maintenance. Our technicians are trained to standards set by this industry-respected independent body, and are available around the clock for scheduled or emergency electrical service.

About NETA »24 Hours

240kV Switching Station Commissioning
240kV Switching Station Commissioning
OverviewThe 356S, 240 kV Switching Station at Milo was built as part of the Southern Alberta Transmission reinforcement Project. The double busbar, breaker-and-a-half configuration system is the large...
More »
Suncor TRO - Testing and Commissioning
Suncor TRO - Testing and Commissioning
OverviewIn 2012, Suncor invested over $1 Billion of infrastructure realignment work to implement the TRO™ process in the Oil Sands operation.  Because tailings management is such a pressing...
More »
Substation Maintenance, Halkirk Wind Farm
Substation Maintenance, Halkirk Wind Farm
OverviewThe Halkirk Wind Farm is a 150-megawatt power generating facility located in Central Alberta. With 83-turbines, it is one of the largest of its kind in the province, capable of producing power...
More »
115kV Substation Feasibility Study
115kV Substation Feasibility Study
Magna IV Engineering performed a feasibility study to investigate three options and provide a recommendation to extend the useful life and increase capacity of the North Fountain Substation, in Founta...
More »
Design, Testing & Commissioning, Radomiro Tomić Mine
Design, Testing & Commissioning, Radomiro Tomić Mine
Radomiro Tomić Mine, crushing and conveyor system electrical and controls engineering as well as onsite commissioning and startup.
More »

Looking for more real world examples?

Check out our project gallery »


Magna IV Engineering
Magna IV Engineering