top of page
PROJECT GALLERY
LNG Canada
Since 2019, Magna IV Engineering has played a vital role in the development and success of the LNGC site, to date we have dedicated over 20,000 person-hours to testing on site.
Transformer and Ground Grid Testing
Aerial transformer and ground grid testing, according to a preventative maintenance plan.
Dry Type Transformer Replacement
12,000lb transformer replacement on the top of a 150m crane
Protection and Control Panel Fabrication
Protection and control panel fabrication for a wastewater treatment plant
2021 Substation Maintenance Shutdown
A 50-person maintenance shutdown on a 6-day schedule. 138kV substation, 15kV - 600V breakers and switchgear.
Control System Migration Commissioning Support
Commissioning support following a migration of all existing instrumentation and control equipment to new Siemens PLCs.
Raw Water Pump Station Engineering Consulting
Engineering consulting for a new raw water pump station for the Town of Drayton Valley's water supply.
Fort Hills Power System Commissioning
Power system commissioning at Fort Hills Oil Sands mine from 2014-2017
Generator Control Upgrade
Primary power generation control system upgrade
Microgrid Smart Generator Controls
Engineering design, specification, construction support and commissioning for microgrid smart controls
550-Acre Solar Power Plant Grounding Study
A 550-acre solar farm grounding system study
Transformer Replacement
Dry type transformer replacement in a downtown government building
Fiber Optic Cable Installation, Termination, & Testing
Full fiber optic system integration. Installation, terminations, and testing.
Medium Voltage Transformer Upgraded Replacement
1MVA transformer upgraded replacement at Canada Olympic Park in Calgary, Alberta
bottom of page